Moulding defect inspection
Plastics & Moulding inspection
If you count scrap at the end of a shift you don't know which cavity made it. Each reject we have had its tool, cavity and shot number so the fix is a process change, not a guess.
Plastics & Moulding
If you count scrap at the end of a shift you don't know which cavity made it. Each reject we have had its tool, cavity and shot number so the fix is a process change, not a guess.
- Short shot, flash, sink mark, warpage detection
- Drift alerts & traceability of cavity level defects
- Dimensional checks, colour streak & gate burr
CellBacklight for silhouette + dome for surface · triggered on mould-open / part-eject · cavity ID carried from the IMM
Where the money is
Scrap counted once, cause already gone
Reject tied to tool, cavity and shot number
Pays back through: material scrap, tool downtime and repeat cavity faults.
Your rupee figure is modelled from your own scrap, rework and warranty numbers during Assess & Feasibility.
| Cavity | Inspection result | Severity |
|---|---|---|
| CAV-4 | Short shot | Critical |
| CAV-4 | Sink mark | Level 2 |
| CAV-1 | Flash at parting line | Level 1 |
| CAV-2 | Within spec | None |
| CAV-3 | Silver streaking | Level 1 |
| CAV-6 | Burn mark / gas trap | Level 2 |
Illustrative output. Detection performance is measured on your parts during feasibility.
Start here
Send us the component.
We will let you know if it is visible.
Send 30-50 samples of your good parts, your failure modes. We do imaging trials, train a model, and come back with what we measured, including the cases where the answer is no.