Skip to main content
360Vision.ai

Solder & assembly inspection

Electronics & PCB inspection

A solder bridge caught at functional test costs you a rework station. You're in the field; you lose the customer. We test every board before it goes to test.

Solder & assembly inspection

Electronics & PCB

A solder bridge caught at functional test costs you a rework station. You're in the field; you lose the customer. We test every board before it goes to test.

  • Check solder joint, bridge & paste volume
  • Presence of component, polarity & offset
  • Silkscreen, serial number and barcode inspection

CellMulti-angle RGB dome with coaxial and low-angle rings · telecentric lens · conveyor-triggered on board-present

Where the money is

TodayAt test

Defects surface at end-of-line functional test

With an inline cellPre-test

Every board judged before it reaches test

Pays back through: test-stage failures, rework labour and field returns.

Your rupee figure is modelled from your own scrap, rework and warranty numbers during Assess & Feasibility.

Live · SMT 1Batch 4417
Board IDInspection resultSeverity
PB-4417-02Solder bridge (U3)Critical
PB-4417-05Missing capacitor C14Critical
PB-4417-08Tombstoned R22Level 2
PB-4417-11Insufficient pasteLevel 1
PB-4417-14Reversed diode D2Critical
PB-4417-17Pass — all netsNone

Illustrative output. Detection performance is measured on your parts during feasibility.

Start here

Send us the component.
We will let you know if it is visible.

Send 30-50 samples of your good parts, your failure modes. We do imaging trials, train a model, and come back with what we measured, including the cases where the answer is no.

Measured detection reportCell design & costed BOMROI model, before capexNDA on request